Reducing Project Time & Costs with Timber Modular Construction

Reducing Project Time & Costs with Timber Modular Construction

Ahead of the 8th Annual Modular and Prefabrication Summit 2017 we chat to Knut Menden, Senior Associate at BVN Architecture about the Our Lady of the Assumption Catholic Primary School (Our Lady) in Sydney which has successfully utilised modular construction to reduce project time and costs, while simultaneously improving user experience and satisfaction.

This article with Knut delves into the Our Lady project – including client needs, building methods, and benefits along with challenges of utilising a modular construction method in the Australian market. 


Please note: That all fields marked with an asterisk (*) are required.